Tuesday 3 February 2015

Slab Ready For Pour & Inspections

Today slab Waffle Pods and formwork were competed.

This was also the day for the first inspection by our independent building inspector.  All seemed well. Upon leaving JG Kings inspector turned up. Was great to be able to meet both.  All good for pour tomorrow.

Rock was also measured on site today with 15 metres for electrical and 96 for  plumbing. That brings a total of 191 metres. Little less than what was expected although still very pricey!