Sunday 7 June 2015

Update

Meeting with new SS did not go well. He seemed totally uninterested in all of my concerns. He even tried to tell me that unsanded plastering (basically the entire house) will be sanded between coats while painting. That is obviousley an absolute lie. I was told there was no reason for me to be at the house until handover.
I am now extreamley concerned about the build. I have had to engage a new inspector for handover but was much more selective. I have appointed Darren Love from Darbecca who seems to really know his stuff.
Garage door has been installed. Next day it was on the ground as it had fallen of. Was dented/damaged.. Stayed on the ground for 5 days but then was put back up, still damaged.
Other issues that have come to light;
Bricks overhang slab by up to 30mm in some places and very poor quality.
Insufficient clearance betweem LPG bottles and HWS (800mm, 1500mm required)
Large hume entry door is heavily water stained.
Ceserstone bech top has been scratched.
Window seals warped and coming away from windows.
Will be interesting couple of months!