No more work has been done at site the past 4 days. I recieved a call from the SS on Friday suggesting I need to lay crushed rock from the front of the block to the house site (50m). Am trying to organize this week as I do not want site access hindered if heavy rain falls. Calculations work out to approx 30m/40m of crushed rock will be required along with bobcat hire.
SS also mentioned he will be measuring rock with the plumbers tomorrow. I am expecting 150sqm, but hoping SS can cut a bit of a deal.
Slab will be poured Wednesday 4/2 and inspected by our personal building inspector a day before. The frame will be delivered 9/2.