Frame erection begun today, 19 days after slab pour. I was suprised as we had some very heavy rain and thunderstorms , but at least 70% of the frame has been stood up. Garage is still on ground.
Rooms feel very spacious and no surprises as far as layout. Hallway as pictured gives a good indication of the length of the house design.
My only concern is the amount of steel in the roof. We have engaged an external contractor to install a Ducted RC aircon which requires a large unit in the ceiling. It will be challenging for the unit to be installed without effecting the structural integrity.
I wouldn't be surprised if frame is completed tomorrow.